Case Studies
Home / Case Studies / UTC Cambridge
Case Study
utc cambridge - teaching laboratories
Previous
Next
Project Brief
CLIENT
BAM Construction
UTC College
BAM Construction
UTC College
TYPE
New Build Installation
SCHOOL
School type: University Technical College
Education Phase: Senior
Gender: Mixed
Local authority: Cambridgeshire
Age range: 14 – 19
UTC Cambridge University Technical College
Cambridge Academy for Science and Technology (formerly UTC Cambridge) is a university technical college which opened in 2014. The Technical college is located on the Biomedical Campus in Cambridge and is next to the Long Road Sixth Form College in Cambridge.
InterFocus were appointed to manufacture and install new science classrooms within the newly built UTC Technical College in Cambridge. The lab areas were designed to be more like commercial laboratories than your typical school classrooms.
The project comprised of
- Manufacture and installation of laboratory furniture
- Trespa TobLab Base worktop fabrication
- Installation of fume cupboards and extracts
- Sinks, taps and ancillary items
Take a look at how UTC is inspiring the next generation of scientists in Cambridge