Case Studies

Case Study

new city college tower hamlets science labs

Project Brief

CLIENT
New City College

TYPE
Turnkey Refurbishment

SCHOOL
College
Gender: Mixed
Age Range: 16+

 

 

 

New City College Tower Hamlets Campus

New City College is the largest college in east London. It was formed back in 2016 with mergers of Hackney Community College and Tower Hamlets College, further mergers took place in 2017, 2018 and 2019 with Redbridge College, Epping Forest College and Havering 6th Form College. Each area has a campus providing a wide range of courses for the local communities. The Tower Hamlets campus has a strong reputation for University progression with many students each year achieving that goal.

InterFocus was asked to provide a turnkey refurbishment solution for New City College Tower Hamlets. We were asked to come up with a modern and bright design for the new Science Classrooms on the Poplar campus. Working with the clients we came up with a rounded design to maximize work space areas but to also give a modern feel to the labs.

The project was split into two phases the North Annex and the South Annex.  Each phase providing new classroom laboratories, Kitchen areas and prep room facilities. A complete overhaul of the heating system was also included with new boilers and boiler room installation. Externally the canopy and walkway areas were refurbished. The project provided some challenges due to the location making deliveries especially challenging. The entire project ran over a period of 9 weeks.

The project comprised of the following key areas

  • Complete strip out and isolation of existing services
  • Removal of internal walls
  • Floor Chasing ready for new M&E services
  • Complete overhaul of heating system with installation of new boilers and boiler room area.
  • Installation of new partition walls and doors
  • New extraction system installed for fume cupboards
  • The canopy and walkway area in the South Annex were refurbished
  • Ground works for new external drains including connections
  • Decorating both internal and external
  • Design and manufacture new laboratory classroom furniture in bold colours, peninsular ends had bespoke curved panels produced and powder coated to match the Anthracite furniture. The different lab areas were colour coded with Lime, Red and Blue. With the prep room areas the design was to maximize storage.
  • Commissioning of fume cupboards and final handover.

 

Privacy Overview
School laboratory Furniture by InterFocus

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.

3rd Party Cookies

This website uses Google Analytics and google tags to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.